- Project worked on from
- Apr - Jun 2023
Kitchen Build

Planning and Design

I started by designing the kitchen in cad - as Ikea didn't stock the colour we wanted we decided to install white door fronts and get them professionally painted
Installing the Cabinets




The first step was installing the wall brackets that the cabinets hang from.
With those in place, I assembled and hung all 47 cabinets.
Once everything was up, I made sure the cabinets were completely level and square before fixing them together.
The trickiest part was cutting and fitting the filler panels to close any gaps — these had to be carefully scribed around uneven surfaces like the ceiling and walls.
Finally, I added the doors and adjusted the hinges to get consistent spacing.
IMPORTANT
The countertop installation and cabinet painting were completed by professionals — my role was focused on the cabinet installation.
Final Product


- Author

- Name
- Ben Hewston